<strike id="dnl9z"></strike>
<address id="dnl9z"><nobr id="dnl9z"><progress id="dnl9z"></progress></nobr></address>

    <address id="dnl9z"><address id="dnl9z"><nobr id="dnl9z"></nobr></address></address>

    <noframes id="dnl9z">
    <noframes id="dnl9z"><form id="dnl9z"></form>

      <address id="dnl9z"></address>

      Reactor Technology

      24-Hour Service Hotline

      +86-510-85958621
      HomeProductCondensing and crystallizing slicing machine

      Products

      upload/ProdPic/202012281445555990.jpg
      Condensing and crystallizing slicing machine
      Product Description

      Instructions for use and installation of condensing crystallization slicer


      1. First check whether the equipment is damaged, and then install it in place. Pay attention to ensure the horizontal position of the drum.


      2. Connect the conveying pipe with the slicer, and install the regulating valve on the feeding pipe.


      3. Connect the water cooling joints at both ends of the roller according to the water inlet and water outlet, and connect the heat medium heating pipe with the equipment.


      4. Start the machine to check whether it is running normally. According to the instructions of the electric cabinet, first press the power start button, and then turn on the frequency converter to adjust the speed. If there is a slow speed, observe whether it is running normally. Then adjust the gap between the slicer and the roller.


      5. Connect the cooling water feeding blade, adjust the feeding speed according to the slice thickness, and check whether the slice thickness and other requirements can meet the requirements. There is no gap between slicer device and rotary roller.


      6. Generally, if the freezing point of normal materials is above 50 degrees, tap water can be used for cooling. If the freezing point is low, refrigeration equipment should be equipped. The faster the cooling, the higher the output.


      Operation procedure of condensing crystallization slicer


      1. Before using the equipment, preheat the discharge basin first to avoid the failure of normal operation due to the solidification layer between the material and the cylinder. Generally, keep the material in liquid state.


      2. Before feeding, the drum should be started, and the drum speed can be adjusted to 2 ~ 3 revolutions per minute.


      3. After feeding, the rotation speed of the cylinder can be adjusted according to the chip requirements, and the chip output will be determined according to the thickness and cooling effect.


      4. At the discharge port, the material can be directly received by bag or through the bin.


      A professional factory that manufactures chemical and pharmaceutical equipment, a comprehensive enterprise integrating R&D, production and service

      Technical Support:YOUWEI

      Tel:+86-510-85958621

      Add:150 meters south of the intersection of Yongfu Road and Fangquan Road, Binhu District, Wuxi City, Jiangsu Province

      Email:cnrq@cnrq.com

      岛国黄色无码免费在线播放电影av
      <strike id="dnl9z"></strike>
      <address id="dnl9z"><nobr id="dnl9z"><progress id="dnl9z"></progress></nobr></address>

        <address id="dnl9z"><address id="dnl9z"><nobr id="dnl9z"></nobr></address></address>

        <noframes id="dnl9z">
        <noframes id="dnl9z"><form id="dnl9z"></form>

          <address id="dnl9z"></address>